Adani Green Energy has operationalised a 250MW wind power generation at the world's largest 30,000 MW renewable energy plant in Gujarat's Khavda
With this milestone, 2,250 MW of cumulative capacity has been made operational at the Khavda plant, Adani Green Energy Ltd (AGEL) said in a statement.
The operationalisation of 250 MW wind capacity at Khavda further strengthens AGEL's leadership in India with the largest operational portfolio of 11,184 MW, the statement added.
The Khavda Renewable Energy plant is equipped with one of the world's largest and most powerful onshore wind turbine generators (WTG) of 5.2 MW capacity each.
The WTGs with high rated capacity enable optimal land use to harness higher energy yield from the same location and bring down the levelized cost of energy (LCOE).
The 5.2 MW WTGs installed at Khavda are built with superior German technology and manufactured at Adani New Industries Ltd's (ANIL) integrated manufacturing ecosystem strategically located near the Mundra port.
AGEL has transformed the Khavda barren wasteland into a hub of clean and affordable energy. The energy from the Khavda RE plant can power 16.1 million homes each year.
(Disclaimer: New Delhi Television is a subsidiary of AMG Media Networks Limited, an Adani Group Company.)
Featured Video Of The Day
BJP vs Congress On US Government Department Move Against Adani Group "Baseless And Denied": Adani Group On A US Government Department Report Adani To Buy PSP Stake To Boost Construction Arm Russia's Firing Of ICBM On Ukraine Is Weapon's 1st Combat Use In History Amazon Employee Greets Friend At Wedding, Dies Of Cardiac Arrest This Asian City Is Emerging As Sex Tourism Hub. It's Not Where You Think Noted Surgeon Dr Mathew Varghese Named 'The One International' South Korea Court Jails Ex-Fiance Of Olympic Medalist For 13 Years Trump Pick Matt Gaetz Withdraws As Nominee For US Attorney General Track Latest News Live on NDTV.com and get news updates from India and around the world.