Here are the five points in this big story:
The construction of the bridge on Budhi Gandak river started in 2016 and was completed in 2022.
The bridge was built at a cost of over Rs 13 crore by Maa Bhagwati Construction Begusarai.
As per information, the front part of the 206-metre long bridge had developed cracks between pillars no 2 and 3 and collapsed on Sunday.
The people in the area have to travel through several villages to reach the main road on NH-31, said Rashtriya Lok Janshakti Party (RLJP) leader Sanjay Yadav.
The accident comes just two months after the Gujarat bridge collapse tragedy in which over 130 people were killed.
Featured Video Of The Day
Mumbai Airport Dazzles In Tricolour Lights On Eve Of Independence Day
Another Bridge Collapses In Bihar, 13th Such Incident In Three Weeks Another Bridge Collapse, Claims Tejashwi Yadav, Official Says "Makeshift Structure" Arrest Me If Am Behind Bridge Collapses: Tejashwi Yadav Dares JDU Rahul Gandhi's Seat At Red Fort Triggers Fresh Congress Attack On BJP 2 French Rafale Jets Collide Mid-Air, Instructor, Pilot Missing "Pivotal Moment": Key Doctor Body Resumes Strike 2 Days After Calling It Off Woman Shares Series Of Harassment Incidents On Delhi-NCR Streets 1 Arrested In Connection To "Friends" Actor Matthew Perry's Death: Report US State Arizona's Ballot Can Describe Fetuses As "Unborn" Humans: Court Track Latest News Live on NDTV.com and get news updates from India and around the world.