India is reviving a three-decade-old plan to build its first passenger aircraft as the South Asian country struggles to join an exclusive club of Asian nations that have advanced far ahead in creating their own home-made jets.
A 14-seat aircraft, called Saras, is undergoing preliminary tests, Jitendra Jadhav, director of Council of Scientific and Industrial Research at state-controlled National Aerospace Laboratories, said in an interview in Bengaluru on Wednesday. The development of the twin-turboprop plane suffered a setback in 2009 when a test flight ended in a fiery crash, killing all three crew on board.
India may need a few hundred small planes that can carry less than 30 people over the next five to seven years for Prime Minister Narendra Modi to succeed in his plan to boost air links in remote areas of the country, according to Sydney-based CAPA Centre for Aviation. India's air force, which has committed to purchasing 15 of the Saras planes, needs to test the aircraft before certifications and sale to commercial airlines, Jadhav said.
The process of getting full certification could take as long as three years, he said.
Delays in production of new aircraft is common across the world, even with established companies like Boeing Co. and Airbus SE.
Mitsubishi Heavy Industries Ltd. announced a fifth delay last month in delivering Japan's first locally made passenger jet to its launch customer, while China's Advanced Regional Jet ARJ21 took 13 years to design, build and bring to market.
India's Saras program was conceived about 29 years ago.
A separate plan to build a bigger, 50-70 seat commercial aircraft is stuck pending government funding, Jadhav said. Feasibility study for the project, which would need a private party to manufacture, has been done and the proposal has been with the government since 2013, Jadhav said.
"The government should sanction funds, only then we can do it," Jadhav said.
(Except for the headline, this story has not been edited by NDTV staff and is published from a syndicated feed.)
A 14-seat aircraft, called Saras, is undergoing preliminary tests, Jitendra Jadhav, director of Council of Scientific and Industrial Research at state-controlled National Aerospace Laboratories, said in an interview in Bengaluru on Wednesday. The development of the twin-turboprop plane suffered a setback in 2009 when a test flight ended in a fiery crash, killing all three crew on board.
The process of getting full certification could take as long as three years, he said.
Advertisement
Mitsubishi Heavy Industries Ltd. announced a fifth delay last month in delivering Japan's first locally made passenger jet to its launch customer, while China's Advanced Regional Jet ARJ21 took 13 years to design, build and bring to market.
Advertisement
A separate plan to build a bigger, 50-70 seat commercial aircraft is stuck pending government funding, Jadhav said. Feasibility study for the project, which would need a private party to manufacture, has been done and the proposal has been with the government since 2013, Jadhav said.
Advertisement
(Except for the headline, this story has not been edited by NDTV staff and is published from a syndicated feed.)
COMMENTS
Advertisement
PM Modi To Visit US For Quad Summit, Attend UN Assembly From September 21-24 True Secular, Liberal And Feminist: Kangana Ranaut Praises PM Modi "Congress Ecosystem Is Angry": PM On Ganesh Puja At Chief Justice Home 9 Dead, 2,800 Hurt As Pagers Explode Across Lebanon, Hezbollah Blames Israel 3 Grams Of Explosives Per Pager: Israel's Complex Op To Hurt Hezbollah "Wear Proper Undergarments": Delta Airlines' New Memo For Flight Attendants New XEC Covid Variant Spreads To 27 Countries, Here's What We Know So Far "Only Consequential Presidents Get Shot At": Trump After Assassination Bid Israel On Alert As Hezbollah Vows Retaliation Over Pager Attacks In Lebanon Track Latest News Live on NDTV.com and get news updates from India and around the world.