A high speed journey on the Bengaluru-Mysuru rail route was so smooth after intensive track maintenance work that it passed a test where not a drop of water spilled out of a glass kept on the table of a coach, Railway Minister Piyush Goyal said.
The minister, in a tweet on Friday night, shared a video of a glass filled with water kept on the table of a compartment from which not a drop spilled during the trip.
"The journey was so smooth that not even a single drop of water spilled out of the glass while the train was travelling at high speed. The results of intensive track maintenance carried out between Bengaluru & Mysuru in Karnataka are there for everyone to see," he tweeted.
The results of intensive track ????️ maintenance carried out between Bengaluru & Mysuru in Karanataka are there for everyone to see.
— Piyush Goyal (@PiyushGoyal) October 30, 2020
The journey has become so smooth that not even a single drop of water ???? spilled out of the glass while the train was traveling at high speed. pic.twitter.com/r7aFp55gSA
A Railway officer said work on the over 130 km stretch was undertaken over the past six months at a cost of Rs 40 crore.
Ballast insertion, tamping of tracks and strengthening of embankments were some of the works carried out, she said.
Track Latest News Live on NDTV.com and get news updates from India and around the world