Ram Temple Construction Committee Chairman Nripendra Mishra on Tuesday rejected the allegations of the temple's chief priest regarding the seepage of rainwater draining out of water from the sanctum sanctorum.
"There was no water leakage but the rainwater came down from the pipes fixed to install electric wires," Mishra said.
"I myself have inspected the building of the temple. The second floor is under construction. When the roof of the second floor will be finally constructed, then the rainwater will stop entering the temple," Mr Mishra told reporters here.
Alleging negligence in the construction of the temple, Ram Janmabhoomi temple chief priest Acharya Satyendra Das had on Monday alleged that there was no arrangement for the draining out of rainwater from the temple premises after the showers on Saturday midnight and urged the temple authorities to take necessary corrective measures.
Mr Das had asked the temple authorities to take cognisance of the incident and make necessary arrangements to stop leakage and ensure outflow of water from the temple.
He had claimed that there was heavy leakage from the roof of the temple's sanctum sanctorum in the first heavy showers that occurred at midnight on Saturday.
Rainwater was leaking from the roof directly above the place where the priest sits in front of Ram Lalla's idol and where people come for VIP 'darshan', he had said.
"It is very surprising that engineers from all over the country are building the Ram temple. The temple was inaugurated on January 22. But, no one knew that if it rains, the roof will leak.
"It is surprising that the roof of a world famous temple is leaking. Why did this happen?" he added.
Such an incident is happening in the presence of such big engineers, which is very wrong, he had said.
Mr Mishra said measures have been taken to protect the devotees from water and sunlight by making temporary construction on the roof.
About the progress of temple construction, Mr Mishra said work on the first floor was on and will be finished by July this year. He expressed the hope that the construction of the temple would be completed by December.
(Except for the headline, this story has not been edited by NDTV staff and is published from a syndicated feed.)
Featured Video Of The Day
Ayodhya Ram Temple To Not Use Chinese Decorative Items During Diwali: Trust Ayodhya's Ram Temple To Be Lit Up With 28 Lakh Diyas For Diwali "Honoured To Visit The Magnificent Temple": Israeli Ambassador Visits Ram Mandir In Ayodhya Russia's Firing Of ICBM On Ukraine Is Weapon's 1st Combat Use In History Amazon Employee Greets Friend At Wedding, Dies Of Cardiac Arrest This Asian City Is Emerging As Sex Tourism Hub. It's Not Where You Think 4 Members Of 'Band Baja Baraat' Gang Arrested From Delhi-Gurugram Border Man Caught On Camera Abusing Pet Dog In Greater Noida, Arrested Putin Hints At Strikes On West In "Global" Ukraine War Track Latest News Live on NDTV.com and get news updates from India and around the world.