Prime Minister Narendra Modi will inaugurate two major national highways and an inland waterways project at his parliamentary constituency, Varanasi today.
The two roads have a combined length of 34 km and have been laid at a cost of Rs 1,571.95 crore. The 16.55-km Varanasi Ring Road Phase-I has been completed at a cost of Rs 759.36 crore, while the four-laning and construction of 17.25-km-long Babatpur-Varanasi Road on NH-56 has cost Rs 812.59 crore, a statement from the PM's office read.
The Babatpur Airport Highway will link Varanasi to the airport and go on to link Jaunpur, Sultanpur and Lucknow. With the flyover at Harhua and a road over bridge (ROB) at Tarna, the new road plan will reduce travel time from Varanasi to the airport, providing relief to the locals and tourists coming here, the statement said.
The Ring Road, with two ROBs and a flyover, is expected to reduce traffic, fuel usage and pollution on NH 56 (Lucknow-Varanasi), NH 233 (Azamgarh-Varanasi), NH 29 (Gorakhpur-Varanasi) and Ayodhya-Varanasi highway, the statement said.
Further the ring road is expected to provide smooth road access to Sarnath, a renowned Buddhist pilgrimage site.
On the day, at a separate event, the prime minister will inaugurate the first multi-modal waterways terminal on the Ganga river as part of the Centre's Jal Marg Vikas Project which aims to develop the stretch of the river between Varanasi and Haldia for navigation of large vessels weighing up to 1,500 to 2,000 tonnes, an official statement said.
The objective of the project is to promote inland waterways as a cheap and environment-friendly means of transportation, especially for cargo movement. The Inland Waterways Authority of India (IWAI) is the project implementing agency.
National Waterway-1 (Haldia-Varanasi stretch) is being developed with technical assistance and investment support from the World Bank. The total estimated cost of the project is Rs 5,369.18 crore, which will be shared between the Government of India and the World Bank on a 50:50 ratio.
The project entails construction of three multi-modal terminals (Varanasi, Sahibganj and Haldia), two inter-modal terminals, five roll-on-roll-off (Ro-Ro) terminal pairs, new navigation lock at Farakka, assured depth dredging, integrated vessel repair and maintenance facility, differential global positioning system (DGPS), river information system (RIS), river training.
"I Am Confident That...": Italy PM Wishes India On 78th Independence Day Thousands To Attend PM Modi's Indian Community Meet In US Next Month: Report In PM Modi's Independence Day Speech, A Call For "24x7 For 2047" Nurse Raped, Killed On Way Home, Body Found 9 Days Later In UP This US City Has Been Declared America's Least Desirable, Survey Finds "Don't Expect Anything From Me": Kolkata Hospital's New Principal Loses Cool Ukraine, Russia Both Claim Advances In Kursk Region Gaza Ceasefire Talks Underway In Qatar As Deaths Top 40,000 Trump To Hold Press Conference, His Campaign Adds Senior Advisers Track Latest News Live on NDTV.com and get news updates from India and around the world.