The making of a rocket

PSLV-C25 after the integration of all its four stages at Moible Service Tower

Oct 18, 2013 15:59 IST
  • PSLV-C25 after the integration of all its four stages at Mobile Service Tower.<br><br>Photo Credit: ISRO
    PSLV-C25 after the integration of all its four stages at Mobile Service Tower.

    Photo Credit: ISRO
  • Advertisement
  • PSLV-C25 third and fourth stages being placed on top of the second stage at the Mobile Service Tower.<br><br>Photo Credit: ISRO
    PSLV-C25 third and fourth stages being placed on top of the second stage at the Mobile Service Tower.

    Photo Credit: ISRO
  • Hoisting of the third and fourth stages of PSLV-C25 during vehicle integration.<br><br>Photo Credit: ISRO
    Hoisting of the third and fourth stages of PSLV-C25 during vehicle integration.

    Photo Credit: ISRO
  • PSLV-C25 fourth stage being hoisted during its integration with the third stage.<br><br>Photo Credit: ISRO
    PSLV-C25 fourth stage being hoisted during its integration with the third stage.

    Photo Credit: ISRO
  • Advertisement
  • First and Second stages of PSLV-C25 at Mobile Service Tower.<BR><BR>Photo Credit: ISRO
    First and Second stages of PSLV-C25 at Mobile Service Tower.

    Photo Credit: ISRO
  • Hoisting of PSLV-C25 second stage in the Mobile Service Tower.<br><br>Photo Credit: ISRO
    Hoisting of PSLV-C25 second stage in the Mobile Service Tower.

    Photo Credit: ISRO
  • PSLV-C25 first stage being surrounded by strap-ons in the Mobile Service Tower.<br><br>Photo Credit: ISRO
    PSLV-C25 first stage being surrounded by strap-ons in the Mobile Service Tower.

    Photo Credit: ISRO
  • Advertisement
  • Hoisting of an interstage of PSLV-C25 during vehicle integration.<br><br>Photo Credit: ISRO
    Hoisting of an interstage of PSLV-C25 during vehicle integration.

    Photo Credit: ISRO
  • One of the strap-ons of PSLV-C25 being lowered to its position during vehicle integration.<br><br>Photo Credit: ISRO
    One of the strap-ons of PSLV-C25 being lowered to its position during vehicle integration.

    Photo Credit: ISRO
  • One of the strap-ons of PSLV-C25 being lowered to its transporter.<br><br>Photo Credit: ISRO
    One of the strap-ons of PSLV-C25 being lowered to its transporter.

    Photo Credit: ISRO
  • Advertisement
  • Preparation of one of the strap-ons before its integration with PSLV-C25 first stage.<br><br>Photo Credit: ISRO
    Preparation of one of the strap-ons before its integration with PSLV-C25 first stage.

    Photo Credit: ISRO
  • Fully integrated first stage of PSLV-C25 in the Mobile Service Tower.<br><br>Photo Credit: ISRO
    Fully integrated first stage of PSLV-C25 in the Mobile Service Tower.

    Photo Credit: ISRO
  • Joining of two segments of PSLV-C25 First Stage in progress in the Mobile Service Tower.<br><br>Photo Credit: ISRO
    Joining of two segments of PSLV-C25 First Stage in progress in the Mobile Service Tower.

    Photo Credit: ISRO
  • Hoisting of one of the segments of PSLV-C25 First Stage during vehicle integration.<br><br>Photo Credit: ISRO
    Hoisting of one of the segments of PSLV-C25 First Stage during vehicle integration.

    Photo Credit: ISRO
  • Two segments of PSLV-C25 First Stage being joined in Mobile Service Tower.<br><br>Photo Credit: ISRO
    Two segments of PSLV-C25 First Stage being joined in Mobile Service Tower.

    Photo Credit: ISRO
  • PSLV-C25 First Stage Nozzle End Segment being placed on the launch pedestal.<BR><BR>Photo Credit: ISRO
    PSLV-C25 First Stage Nozzle End Segment being placed on the launch pedestal.

    Photo Credit: ISRO