Hancock Bridge
- All
- News
-
Court Threatens To Stop Salary Of Mumbai Civic Body, Railway Staff For Failing To Construct A Bridge
- Friday November 17, 2017
- Mumbai News | Press Trust of India
The Bombay High Court today threatened to halt the disbursement of salaries of the staff concerned of the BMC and the Central Railways over their failure to construct a new foot overbridge (FOB) in place of the now demolished Hancock Bridge.
- www.ndtv.com
-
Central Railway Operates 18-Hour Mega Block To Dismantle British-Era Bridge
- Sunday January 10, 2016
- Mumbai News | Press Trust of India
The Central Railway today operated an 18-hour-long 'mega block', or curtailment of trains, on its main line between Byculla and CST railway stations to dismantle the iconic 136-year-old Hancock Bridge.
- www.ndtv.com
-
Court Threatens To Stop Salary Of Mumbai Civic Body, Railway Staff For Failing To Construct A Bridge
- Friday November 17, 2017
- Mumbai News | Press Trust of India
The Bombay High Court today threatened to halt the disbursement of salaries of the staff concerned of the BMC and the Central Railways over their failure to construct a new foot overbridge (FOB) in place of the now demolished Hancock Bridge.
- www.ndtv.com
-
Central Railway Operates 18-Hour Mega Block To Dismantle British-Era Bridge
- Sunday January 10, 2016
- Mumbai News | Press Trust of India
The Central Railway today operated an 18-hour-long 'mega block', or curtailment of trains, on its main line between Byculla and CST railway stations to dismantle the iconic 136-year-old Hancock Bridge.
- www.ndtv.com