A Mohali-based real estate company has succeeded in creating a record of constructing a 10-storey building within 48 hours.
The building was constructed using pre-fabricated steel structure technology. Three cranes were pressed into service to assemble the pre-fabricated roof and walls, which were prepared in the factory. The pre-fabrication took three months in the factory.