Key Features Of New Pamban Bridge

By: EjazUlHaqBhat

Image: X/@AshwiniVaishnaw

The new Pamban bridge in Tamil Nadu is India's first vertical lift railway sea bridge and will replace the existing 105-year-old bridge

Image: X/@AshwiniVaishnaw

Railway Minister Ashwini Vaishnaw recently described the bridge as "a modern engineering marvel"

Image: X/@AshwiniVaishnaw

He said the project was a "significant upgrade, designed for speed, safety and innovation"

Image: X/@AshwiniVaishnaw

The bridge has a fully automated vertical lift span that raises the central span to allow ships to pass through

Image: X/@AshwiniVaishnaw

It has a 22-meter air clearance for ships, which is higher than the 19-meter clearance of the old bridge

Image: X/@AshwiniVaishnaw

The bridge has double tracks and is designed for high-speed trains, and supports modern rail systems

Image: X/@AshwiniVaishnaw

The bridge has a 73-meter navigational span for marine traffic, featuring 100 spans, with 99 of them measuring 18.3 m in length. The bridge is 2,070 m long

Image: X/@AshwiniVaishnaw

The New Pamban Bridge is being built parallel to the existing bridge to replace the old rail bridge, which was decommissioned in December 2022 due to corrosion 

Image: X/@AshwiniVaishnaw

Check More Stories

ndtv.com