Electricity production in Nepal's Nuwakot's hydro-electric plant has been stalled after a person climbed on a power transmission line and has been clinging onto it.
Nepal Electricity Authority (NEA) was forced to shut down the power project and cut off the power supply to the Upper Trishuli 3A Hydel station line after a person climbed on the transmission line in Nuwakot.
The Upper Trishuli 3A Hydel station has a capacity of 60 MW.
The person has been identified by the local police as Maila BK from Ghalegaun of Belkotgadhi Municipality-13 of the Nuwakot district.
"BK is clinging to the transmission wires past 10 AM (NST), therefore, we have cut the power supply," confirmed spokesperson Suresh Bhattarai over the phone to ANI.
As per the official at the NEA, an average loss of around 1 million Nepali Rupees has been incurred by the country due to the disruption in the power supply.
Meanwhile, the Minister for Energy, Pampha Bhusal also has appealed to Nepal Army to deploy a helicopter to take and bring down the person off the transmission line and prevent further loss.
(Except for the headline, this story has not been edited by NDTV staff and is published from a syndicated feed.)
K P Sharma Oli Becomes Nepal's Prime Minister For 3rd Time Nepal PM Loses Vote Of Confidence In Parliament Nepal President's Aide Resigns After Criticising Notes With Map Of Indian Region UP BJP Rejig Soon? State Chief Offers To Quit Over Poll Drubbing: Sources Flying Squad Climbs Wall, Crashes Rajasthan School Exam, Finds Mass Cheating "I Divorce You... Your Ex-Wife": Dubai Princess Dumps Husband In Insta Post Fire Breaks Out In China Shopping Centre With People Trapped Inside: Report Deepika Padukone Said She Has Never Followed A Diet "That Is A Fad" US Woman Arrested For Sitting On Foster Son, 10, That Caused His Death Track Latest News Live on NDTV.com and get news updates from India and around the world.