The $14.2 million bridge in Miami was built in just six hours
New Delhi:
A week after a massive pedestrian bridge collapsed in southern Florida, crushing many cars and six people under it, a video - captured from the dashcam of a vehicle on the highway - has surfaced, showing the 950-ton structure crumble down.
Posted on YouTube, the video shows multiple cars in three queues, waiting to pass the traffic junction just a few metres after the $14.2 million bridge. And then it happens. The newly-built bridge plummets onto traffic on one of the busiest roads in South Florida, crushing cars and people underneath. (Scroll below for video)
The 174-feet-long bridge connected the Florida International University (FIU) with the city of Sweetwater and was installed in six hours over the eight-lane highway on March 15.
The bridge was intended to provide a walkway over the busy street, where an 18-year-old female FIU student from San Diego was killed in August as she attempted to cross, according to reports.
To limit disruption to traffic during construction, the 174-foot portion of the bridge was built adjacent to Southwest 8th Street, using a method called Accelerated Bridge Construction.
The bridge was designed to withstand a Category 5 hurricane, the rating given the most dangerous storms by the National Hurricane Center, and built to last 100 years.
With inputs from agencies
Posted on YouTube, the video shows multiple cars in three queues, waiting to pass the traffic junction just a few metres after the $14.2 million bridge. And then it happens. The newly-built bridge plummets onto traffic on one of the busiest roads in South Florida, crushing cars and people underneath. (Scroll below for video)
The 174-feet-long bridge connected the Florida International University (FIU) with the city of Sweetwater and was installed in six hours over the eight-lane highway on March 15.
The bridge was intended to provide a walkway over the busy street, where an 18-year-old female FIU student from San Diego was killed in August as she attempted to cross, according to reports.
To limit disruption to traffic during construction, the 174-foot portion of the bridge was built adjacent to Southwest 8th Street, using a method called Accelerated Bridge Construction.
The bridge was designed to withstand a Category 5 hurricane, the rating given the most dangerous storms by the National Hurricane Center, and built to last 100 years.
With inputs from agencies
Track Latest News Live on NDTV.com and get news updates from India and around the world